Wall thickness:16mm
Length:52.80m
Application:Rainwater and sewage pipe
Project Introduction:The pipe to be repaired was a DN2000 concrete rainwater pipe with a length of 52.80 meters. During the construction process, there was still flowing water in the pipeline.
Construction Challenge:
1. Due to the heavy weight of the large-diameter UV-CIPP liner, the liner may be twisted when it was lowered into the well. If the construction experience was insufficient, it may lead to curing failure;
2. For the repair of DN2000 pipes, strict control of pressure maintaining and walking time was required, which was a severe test for the UV curing lamp.
Wall thickness:16mm
Length:52.80m
Application:Rainwater and sewage pipe
Project Introduction:The pipe to be repaired was a DN2000 concrete rainwater pipe with a length of 52.80 meters. During the construction process, there was still flowing water in the pipeline.
Construction Challenge:
1. Due to the heavy weight of the large-diameter UV-CIPP liner, the liner may be twisted when it was lowered into the well. If the construction experience was insufficient, it may lead to curing failure;
2. For the repair of DN2000 pipes, strict control of pressure maintaining and walking time was required, which was a severe test for the UV curing lamp.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |